Program-level and per-part review of cycle time, material cutting, air cutting, rapid movement, and idle time for CNC-110.

1 Executive Summary

Headline numbers and the primary cutting performance opportunity identified in the period.

Time Accounting (of Total Recorded Time)

Total Recorded Time
28.72h
Cycle + idle telemetry
Material Cutting Time
16.14h
Productive cutting time
Rapid Movement Time
1.81h
In-cycle non-cut movement
Idle Time
9.07h
No program running

Cycle Composition (of Cycle Time)

Cycle Time
19.65h
MC + AC + RM
MCT %
82.2%
Material cutting share
RMT %
9.2%
Rapid/traverse share
ACT %
8.6%
Air cutting share

Identified Opportunities

↔
Rapid Movement — In-cycle lever
Rapid movement accounts for 1.81h (9.2% of cycle time). The largest absolute contributor is O2623.
0.45h
If RM reduced 25%
✈
Air Cutting — CAM lever
Air cutting totals 1.70h. Program O2611 contributes the largest absolute AC (00:20:36) and has ACT% of 73.7%.
0.85h
If AC halved
Where to focus first
Start with the highest absolute rapid movement and air-cutting contributors. In this dataset, O2623 leads rapid movement and O2611 leads air cutting.

2 Terminology & Definitions

How each metric in this report is calculated from raw machine telemetry.

Total Recorded TimeCycle time plus idle time recorded in the telemetry period.
Cycle TimeTime during which a program was actively executing (MC + AC + RM).
MC — Material CuttingTool is cutting material; primary productive machine time.
AC — Air CuttingProgram active but no material removed: approach, clearance, repositioning, or dwells.
RM — Rapid MovementRapid traverse / non-cutting movement between features or operations.
IdleMachine not executing a program between parts or operations.
MCT %Material Cutting ÷ Cycle Time × 100.
ACT %Air Cutting ÷ Cycle Time × 100.
RMT %Rapid Movement ÷ Cycle Time × 100.
Utilisation %Cycle Time ÷ Total Recorded Time × 100.

3 Performance Breakdown

Time accounting for the supplied production dataset.

PeriodTotal Recorded
(HH:MM:SS)
Cycle Time
(HH:MM:SS)
MC
(HH:MM:SS)
AC
(HH:MM:SS)
RM
(HH:MM:SS)
Idle
(HH:MM:SS)
MCT %ACT %RMT %Util %Parts
TOTAL28:43:0719:38:4716:08:3801:41:4201:48:2709:04:2082.28.69.268.499
Time Allocation (decimal hours)
Total16.1h1.7h1.8h9.1h
Material Cutting (MC)
Air Cutting (AC)
Rapid Movement (RM)
Idle

4 Program-Level Performance

Programs sorted by total active cycle time. Highlighted rows indicate the largest rapid-movement and air-cutting contributors.

ProgramPartsTotal Cycle
(HH:MM:SS)
MC
(HH:MM:SS)
AC
(HH:MM:SS)
RM
(HH:MM:SS)
MCT %ACT %RMT %Focus
O2601203:20:5503:10:5400:02:4000:07:2195.01.33.7Stable
O2631101:31:0601:21:3000:03:2500:06:1189.53.86.8Stable
O2629401:06:4901:04:2100:00:5400:01:3496.31.32.3Stable
O2636101:05:2901:02:5000:00:2900:02:1096.00.73.3Stable
O2623400:55:2200:43:3300:01:3900:10:1078.73.018.4★ Highest RM
O2637100:52:4100:37:2600:12:3000:02:4571.123.75.2Review
O2624400:45:1500:40:2600:00:5900:03:5089.42.28.5Stable
O2638200:42:5700:33:4800:05:0400:04:0578.711.89.5Stable
O2626700:39:0900:29:5400:02:4500:06:3076.47.016.6Stable
O2628400:37:4700:36:3800:00:2500:00:4497.01.11.9Stable
O2633100:37:3700:31:4800:02:2900:03:2084.56.68.9Stable
O2634500:35:5600:24:0700:02:2900:09:2067.16.926.0Review

Rows are sorted by absolute cycle time, because the largest cycle consumers drive the biggest improvement economics.

5 Air Cutting Deep-Dive — In-Cycle Lever

1.70h of air cutting were observed. Air cutting is directly addressable through CAM optimisation.

ProgramPartsTotal Cycle
(HH:MM:SS)
Air Cutting
(HH:MM:SS)
ACT %Share of Total ACPriority
O2611100:27:5600:20:3673.720.3%★ Primary focus
O2637100:52:4100:12:3023.712.3%Secondary
O2638200:42:5700:05:0411.85.0%Low impact
O2610100:18:5000:04:3624.44.5%Secondary
O2612100:11:0000:04:2440.04.3%Secondary
O2607300:17:1900:03:4421.63.7%Secondary
O2631101:31:0600:03:253.83.4%Low impact
O2647300:09:1500:03:0132.63.0%Secondary
O2608100:19:4900:02:5915.12.9%Low impact
O2626700:39:0900:02:457.02.7%Low impact
Air Cutting Time by Program (hours)
O26110.34h (73.7% ACT)O26370.21h (23.7% ACT)O26380.08h (11.8% ACT)O26100.08h (24.4% ACT)O26120.07h (40.0% ACT)O26070.06h (21.6% ACT)O26310.06h (3.8% ACT)O26470.05h (32.6% ACT)O26080.05h (15.1% ACT)O26260.05h (7.0% ACT)

Program O2611 contributes 20.3% of total air-cutting time.

6 Per-Part Detail (Appendix)

Reference data for all 99 parts in the reporting period. Use the controls to filter by program and sort.

— parts
ProgramPart CountCycle TimeMCACRMMCT %ACT %RMT %

7 Key Observations & Recommendations

Observations

1Material cutting is 82.2% of active cycle time.
2Rapid movement totals 1.81h (9.2% of cycle), with O2623 the largest absolute contributor.
3Air cutting totals 1.70h (8.6% of cycle). The highest absolute AC program is O2611.
4Idle time totals 9.07h, reducing utilisation to approximately 68.4%.
5The appendix now includes the program associated with each part record, enabling direct per-part program filtering.

Recommendations

1Review rapid traverse and linking moves on O2623 and the top RM programs: O2623, O2634, O2601, O2626, O2631.
2Review O2611 for air-cutting reductions: approach distance, dwell timing, safe-plane strategy, and non-cut lead-in/out moves.
3Use the program-filtered appendix to validate whether high AC/RM behaviour is isolated to specific part counts or consistent across a program run.

8 Next Steps

1CAM/programmer review of the top rapid-movement programs: O2623, O2634, O2601, O2626, O2631.
2Focused air-cutting cleanup for O2611, O2637, O2638, O2610, O2612.
3Production review of idle periods to separate operator wait, loading, inspection, break, and machine-available causes.